A) Provide and lay tiles which have been of different types and measurements within the permitted listing of elements or The Contractor shall also supply timber plywood for the higher unit around the parts for being repaired. The timber plywood shall work as a “bridging” about the hacked spot and https://andyd210odq6.idblogz.com/profile