As seen through the figure beneath, steady auger is utilized to drill the borehole, raise up drilled soil, and pour concrete whilst the auger is moved up. Therefore, the borehole does not will need casing or hydrostatic force to circumvent damage to the borehole wall. The construction system features drilling https://brooksxhlor.acidblog.net/63672403/the-5-second-trick-for-cast-in-situ-piles-in-dhaka