To achieve the buck/Enhance attribute, all of that is necessary is 2 individual switches so which the AC input could be connected to one of several two Main taps, whilst the load is linked to the other, So using the major transformer's Most important windings as an autotransformer. [3] Upgrading https://preechaconcretepile61481.review-blogger.com/55576109/ups-uninterrupted-power-supply-secrets